 |
| |
|
|
Environmental |
|
 |
Reed & Reed is quite familiar
with environmental work. We have the OSHA-trained supervision
and crews to safely work on projects requiring special
procedures to deal with environmental projects. We’ve
removed fuel farms on naval bases, driven sheets on
a hazardous waste project, and cleaned up contaminated
soils on the Maine Turnpike.
We work closely with the DEP, and have the equipment
and contacts with environmental cleanup firms to do
this type of work productively and safely. Here are some recent examples of our environmental
work.
|
 |
|
 |
 |
Waste Water Treatment Plant
Cruz Bay, St John, U.S. Virgin Islands |
| |
 |
Seabrook Harbor National Shoreline Project
Seabrook, New Hampshire |
| |
 |
Submerged Bulkhead and Seawall Stabilization
East Boston, Massachusetts |
| |
 |
Crossroads Landfill Phase 8C Retaining Wall
Norridgewock, Maine |
| |
 |
Underground Fuel Tank Replacement
Naval Air Station, Brunswick, Maine |
| |
 |
Underground Tank Removal
Brunswick, Maine |
| |
 |
Water Treatment Plant
Boothbay, Maine |
| |
 |
Jet Fuel Farm
Brunswick, Maine |
| |
 |
Sheet Pile Cofferdam
Rockingham, Vermont |
| |
  |
|
|
 |
Milbridge Project Ahead of Schedule - 4/22/2008
Reconstruction of the Great North and Great South Bridges in Milbridge, Maine Ahead of Schedule |
| |
Penobscot Narrows Bridge and Observatory - 2/25/2008
When the 75 year-old US Rt. 1, Waldo – Hancock bridge connecting Prospect, Me to Verona Island and the rest of Downeast Maine was determined to be deteriorated beyond repair in the summer of 2003 it presented Maine DOT and the construction industry with a huge challenge... |
| |
More News... |
 |
|
|
 |
| |
|