 |
| |
|
|
Parking Garages |
|
| |
Reed & Reed has constructed numerous parking garages in Maine and New Hampshire over the past 20 years.
- Types of Construction:
- Precast, prestressed concrete
- Structural steel frame and precast deck
- Structural steel frame and cast-in-place deck
- Adding levels to existing garages
- Reed & Reed role in various parking garage and building projects:
- General Contractor
- Design-Build Contractor
- Precast Erector
- Construction Manager
- Reed & Reed Scope of Services
- Design
- Pile foundations and shoring
- Concrete foundations
- PCI Certified Erectors for precast erection
- GC/CM for all other trades
- Value added services by Reed & Reed
- Can optimize design to conform to specific site requirements
- “Backstop capability” for most construction trades
- Integrated CPM schedule for managing work
- Self performance of key scopes reduces cost and schedule risk
- Local resources and people to service the work
- Reliable, long-term provider of construction services
- Value Engineering
- Fast Track construction
|
 |
|
 |
 |
Exeter Hospital Parking Garage
Exeter, New Hampshire |
 |
 |
Augusta Parking Garage
Augusta, Maine |
 |
 |
Racino Parking Garage Precast Erection
Bangor, Maine |
 |
 |
Maine Med Parking Garage Precast Erection
Portland, Maine |
 |
 |
Pickering Square Parking Garage Phase II
Bangor, Maine |
 |
 |
Spring Street Parking Garage Reconstruction
Portland, Maine |
 |
 |
Elm Street Parking Garage
Portland, Maine |
 |
 |
Plaza Parking Structure
Bangor, Maine |
 |
 |
Central Maine Medical Center Parking Garage
Lewiston, Maine |
 |
 |
Portsmouth Parking Garage
Portsmouth, New Hampshire |
 |
 |
Portland International Jetport Parking Garage
Portland, Maine |
 |
 |
Chapel Street Parking Garage
Lewiston, Maine |
 |
 |
|
|
|
 |
Reed & Reed Erects 100th Wind Turbine - 6/22/2010
Our crews focus on safety, quality and performance and it really shows in how we have become an industry leader in wind power.” |
| |
Wallagrass Bridge Project - 6/22/2010
Reed and Reed was the low bidder for the construction of a new bridge over Wallagrass Stream on the heavily used Route 11 north of Eagle Lake. |
| |
South Thomaston Bridge Project - 6/22/2010
Reed & Reed Inc. is nearing completion of the $2 M bridge replacement project in South Thomaston, Maine. |
| |
Berkshire Wind Power Project - 6/22/2010
Reed & Reed is responsible for the civil, foundation and electrical designs, Quality Control, Safety Management and all phases of construction. |
| |
Veterans Memorial Bridge - 6/22/2010
Reed is applying for SHARP status on the Veterans Memorial Bridge project. SHARP is a federal Safety and Health Achievement Recognition Program for recognizing achievements by employers in workplace safety and health. It is the highest honor given by OSHA. |
| |
Norridgewock Bridge Project - 6/22/2010
When completed the Norridgewock Bridge will be one of two modern concrete tied arch bridges in the United States. (The Depot Street Bridge in the State of Oregon is the other.) |
| |
More News... |
 |
|
|
 |
| |
|